Originally Posted by
n15sk4
any uptade on this setup?
So here's where it stands ..
I have *fingers crossed* all the pieces I need.
I even have the fender roller.
I still need a heat gun. So I don't bugger up the paint.
I need time.
The fender rolling alone will take me about an hour a side. And then there is everything else.
Quick release bumper bits.
Rear Brake lines
Front brake lines
Calipers.
I figure a good solid 4-5 hours.
At the same time I want to remove the uprated front suspension so I can fab the tabs to reconnect the sway bar.
Another hour or so.
There is also some rubberized spray is like to coat the inside of the fenders with since I removed the plastic liner.
This way when I roll the fenders it will have a z-tuned look to the fenders. Which will help vent the engine bay and wheel well. Another 2 hours.
Add this to being in a bsmt and working in a drive way another 2 hours walking back and forth getting things I need.
And beer breaks ... At least an hour.
Oh and documenting the process. Add an hour . What's that like 13hours ?
And it's still February lol. Crap....
What I would give for a heated garage workspace for the weekend...
Unless that happens it will probably have to warm up abit before I can proceed.
And since it's tax, er, I mean RaceKar stimulus package season I'm sure some other projects will start blossoming << get it, spring time, blossoming...
__________________________________________
View my fuel log 2015 Micra S manual: 7.7 L/100 km ... 36.8 mpg (Imp) ... 13.0 km/L ... 30.6 mpg (US) ...